Cement Plant For Calvac Pavings Blog
Cement Contractors
Asphalt Repair

Maintenance Monday – How Portland Cement is Made

Maintenance Monday:

How Portland Cement is Made

Facebook
LinkedIn
Twitter
Pinterest

Portland cement is the basic ingredient of concrete. Concrete is formed when Portland cement creates a paste with water that binds with sand and rock to harden. Cement is manufactured through a closely controlled chemical combination of calcium, silicon, aluminum, iron, and other ingredients. Common materials used to manufacture cement include limestone, shells, and chalk or marl combined with shale, clay, slate, blast furnace slag, silica sand, and iron ore. These ingredients, when heated at high temperatures form a rock-like substance that is ground into the fine powder that we commonly think of as cement. 

The most common way to manufacture Portland cement is through a dry method. The first step is to quarry the principal raw materials, mainly limestone, clay, and other materials. After quarrying the rock is crushed. This involves several stages. The first crushing reduces the rock to a maximum size of about 6 inches. The rock then goes to secondary crushers or hammer mills for reduction to about 3 inches or smaller. The crushed rock is combined with other ingredients such as iron ore or fly ash and ground, mixed, and fed to a cement kiln. The cement kiln heats all the ingredients to about 2,700 degrees Fahrenheit in huge cylindrical steel rotary kilns lined with special firebrick. Kilns are frequently as much as 12 feet in diameter—large enough to accommodate an automobile and longer in many instances than the height of a 40-story building. The large kilns are mounted with the axis inclined slightly from the horizontal.

Old cement dispenser company

The finely ground raw material or the slurry is fed into the higher end. At the lower end is a roaring blast of flame, produced by precisely controlled burning of powdered coal, oil, alternative fuels, or gas under forced draft. As the material moves through the kiln, certain elements are driven off in the form of gases. The remaining elements unite to form a new substance called clinker. Clinker comes out of the kiln as grey balls, about the size of marbles. Clinker is discharged red-hot from the lower end of the kiln and generally is brought down to handling temperature in various types of coolers. The heated air from the coolers is returned to the kilns, a process that saves fuel and increases burning efficiency. After the clinker is cooled, cement plants grind it and mix it with small amounts of gypsum and limestone. Cement is so fine that 1 pound of cement contains 150 billion grains.  The cement is now ready for transport to ready-mix concrete companies to be used in a variety of construction projects. Although the dry process is the most modern and popular way to manufacture cement, some kilns in the United States use a wet process. The two processes are essentially alike except in the wet process, the raw materials are ground with water before being fed into the kiln.

Contact Calvac today for your paving needs.

© 2024 All Rights Reserved.


The Lost Art Of Concrete

The Lost Art Of Concrete

Facebook
LinkedIn
Twitter
Pinterest
San Jose asphalt and concrete project warranty workers

The saying “They don’t build ‘em like they used to” is literal truth in the concrete industry.

For decades, modern science has struggled to work out how ancient societies such as the Romans were able to create buildings, monuments, and roadways which are still visible and even in use today, when the average lifespan of modern concrete tends to be far more modest. Now, a team of scientists from the University of Utah believes they may have found the surprising answer to this centuries-old mystery. Modern concrete uses Portland cement as its base, which is a fine powder created from lime, chalk, sandstone, iron and other materials and then combined with aggregates of varying sizes. However, the Romans used a type of cement created from the ash of certain volcanoes. These volcanoes’ emissions contained a rare combination of mineral elements which only occurs naturally in very specific areas with particular geological profiles.

What’s most surprising is that the minerals which make Roman cement different from Portland cement appear to react to seawater, which encourages the crystalline structure of the minerals to continue growing. This actually makes the concrete self-healing and impedes cracking, a feat modern science is still trying to replicate. This discovery of how Roman concrete was made is important because it could lead to greener and more eco-friendly concrete production and paving technologies, as well as structures with higher strength, structural integrity and longevity under adverse conditions than modern concrete allows for. In addition, Roman concrete did not use reinforcing steel such as a wire mesh mat or rebar, both of which Portland cement will corrode and degrade over time. This may lead to significant cost reductions for new construction on structures like bridges, building footings and other applications.

However, the research team warns it’s too early to get too excited about Roman concrete. First, Roman concrete relies on very specific minerals, namely tobermorite and phillipsite, being present in certain quantities. The researchers say the composition of Roman concrete was largely a matter of luck and being in the right place, at the right time, with access to the right materials. Second, we don’t yet know exactly how the Romans made their cement or what the process was for mixing it with aggregate and placing it. This by itself may leave us several years, or even decades, away from being able to use Roman concrete effectively. Despite these hurdles, the concepts behind Roman concrete and other green discoveries from the ancient world are constantly being studied, evaluated and applied to our modern understanding of how to build things that last.

At Calvac Paving, we’ve been serving the Bay Area for over 45 years in the most environmentally friendly, safe and expedient way possible. We’re always on the lookout for new developments, technologies and ideas which will let us do our jobs more effectively, with less impact on the world we all share. To learn more about our commitment to the environment, or how Calvac Paving can help you with your next project, contact us at: Calvac Paving 2645 Pacer Ln San Jose, CA 95111 (408) 837-9021

© 2024 All Rights Reserved.


Calvac Paving And San Harbour South HOA : A New Parking Lot Case Study

Calvac Paving And San Harbour South HOA

A New Parking Lot Case Study

Facebook
LinkedIn
Twitter
Pinterest

Calvac Paving recently undertook a paving rehabilitation project for the San Harbour South HOA  association located at 906 Beach Park Boulevard in Foster City, California. The existing pavement was over 45 years old and was starting to exhibit severe cracking and base failures.

Calvac Paving setting up

Primary Client Concerns

The primary client concerns included:

  • Continuous access during the milling, repaving and striping operations

  • Cost

  • Schedule and time management

  • Quality surface at the project’s end

Proposed Solution

IMG_1971

After reviewing the jobsite in person, we came up with a range of possible solutions that would meet the client’s needs.

Calvac Paving

Due to sub-grade issues. We proposed milling the existing pavement down 2” from the existing surface and laying approximately 2,500 tons of ½” aggregate hot mix, in addition to the replacement of 1,500 linear feet or 90 cubic yards of concrete valley gutter. Our recommendations and proposed fix were accepted by Calvac’s client and HOA Board. The job was undertaken in phases as to not disrupt the community at one time.

Final Results

Finished Project Piece

The end result of the San Harbour South HOA project looked fantastic! The project went off without any difficulty and was completed within the stated schedule and budget.

Calvac Paving is proud to have served the Bay Area for over 45 years with a wide range of paving, concrete and ADA access planning and implementation solutions. Why gamble with the outcome of your project? Make sure your contractor can get it done right the first time, every time. To learn more about how Calvac Paving can help service your construction job or to obtain a quote for services, please call us at 408-225-7700.

Contact Us:

Calvac Paving 2645 Pacer Ln San Jose, CA 95111 408-225-7700

© 2024 All Rights Reserved.


5 Simple Ways To Winterize Your Paving

5 Simple Ways To Winterize Your Paving

Facebook
LinkedIn
Twitter
Pinterest

With winter and its accompanying rainfall on the way, the fall is a good time to take a look at your existing pavement and make sure it’s ready for the weather to come. Calvac Paving has been in the business for over 45 years, and in that time, we’ve learned a thing or two about how to solve small problems before they have a chance to become big ones. Now, we’re pleased to present this list of simple things you can watch for so your pavement lasts longer and looks and performs better in the process, even when the worst of the California winter weather strikes!

  1. Do a routine walkthrough of your paved areas.

Parking lots and other paved areas should be checked at least semiannually for problems. Things to look for include:

  • Areas of standing water. Water can break down the asphalt binder and leak down into the subgrade, eroding it over time. This is also an indication that the pavement or subgrade may already be failing because modern grading techniques are designed to establish a grade that flushes water away from the parking area and toward designated drainage points.
  • Oil or other chemicals that leak directly onto the pavement. Just like water, some chemicals associated with vehicles can cause binder breakdown and lead to subsurface problems. Cleaning up oil and other chemical spills as quickly as possible can help prevent this and keep your asphalt in better condition.
  • Cracks, divots or uneven areas. These can be caused by weeds growing beneath the surface, freeze/thaw patterns, standing water and oil or ongoing heavy truck traffic. Small cracks and divots are often the first visible sign of possible asphalt breakdown, and it’s more cost-efficient and less intrusive to fix them when they’re small by seal coating or spot patching than it is to do a complete tear-out and reinstall of the paving.
  • Striping: Old, dull or worn striping and pavement-level signage such as fire lane indicators and other information may be harder to see and read during winter months. Especially in ADA stalls, the striping and signage should always be clearly visible to make sure people know where these areas are.
  • Recently Complete Project
  1. Clear debris from drainage channels and curbs.

If water has nowhere to go, it doesn’t matter how good the drainage plan for your lot is. Making sure the drainage channels, storm sewers and other inlets to the runoff system near your property are clear of leaves, branches, garbage and other obstructions will help the water flow better and make it less likely to pool up on your property.

Calvac Paving Team
  1. Limit or restrict heavy-vehicle traffic as much as possible.

Large trucks such as semis, garbage trucks and other heavy vehicles can place a lot of stress on asphalt. By itself this shouldn’t be a problem, but when the base course and subgrade are compromised by water or plant intrusion, it could speed up the breakdown process for the asphalt. If at all possible, try to limit, restrict or even out the traffic pattern for such vehicles within your lot to minimize the time they spend on your pavement.

  1. Be sure it’s sealed.

Even if your parking area is free from cracks and other problems, it is a good idea to have it seal coated every 4 to 5 years at the minimum. This is because seal coating helps rejuvenate the asphalt binder at the surface, adding an extra layer of protection against traffic, water and other spills. Even better, it will help make your parking lot and driveways look newer, especially when you redo the striping at the same time. This makes your property more attractive, safer to navigate and less likely to fail for the long haul.

  1. Seek professional help.

If you’re not sure if the paving problems you’ve identified are “big enough,” or if you think your pavement needs a facelift or a complete overhaul, Calvac Paving can help. We’ve been serving the Bay Area for over four decades with quality construction solutions including:

  • Curb and gutter remediation, repair and replacement
  • Paving rehabilitation, tear-out and reconstruction
  • ADA access compliance and signage
  • And much more!

We take great pride in delivering a great product for your project, within the schedule and budget we agree upon. For more information about how Calvac Paving can help you with your paving or asphalt project, please contact us for a no-charge estimate.

Calvac Paving
2645 Pacer Ln
San Jose, CA 95111
408-225-7700

 

© 2024 All Rights Reserved.


Studies Show Cigarette Butts May Be The Next Hot Thing In Paving

Studies Show Cigarette Butts May Be The Next Hot Thing In Paving

Facebook
LinkedIn
Twitter
Pinterest

Every year, about 6 trillion cigarette butts are produced worldwide, or about 800 discarded butts for every man, woman and child on the planet. Not only are these butts an unsightly and expensive waste disposal problem, but the toxic chemicals which the filters trap and contain leach out over time to poison soil, groundwater, rivers and oceans. Now, a researcher at RMIT in Melbourne, Australia says he may have found a surprising answer to this problem: incorporate cigarette butts into asphalt aggregate!

According to the researcher, by coating the butts with a combination of paraffin wax and bitumen, the black substance also known as “tar” that gives asphalt its distinctive properties, it is possible to trap toxins which used butts contain while repurposing them as a lightweight, flexible asphalt aggregate component. This reduces the overall weight of an asphalt mix design while removing a potential 1.2 million metric tons of waste from the planet’s biosphere.

Another interesting side effect of adding cigarette butts to asphalt is the reduction of heat. Asphaltic concrete has been directly linked to the so-called “urban heat island” effect, caused by vast amounts of asphalt in a relatively small area. Cigarette filters are mostly made from cellulose acetate, a fibrous material which is spun down to look and feel like cotton. This material serves as an insulator which filters out toxins in cigarette smoke while helping prevent burnt fingers for those who simply must light up. These filters reduce thermal conductivity and reduce the thermal density of the mix. When placed as part of a roadway the asphalt containing the filters absorb and diffuse more heat, resulting in a cooler surface temperature and less radiant heat being redirected into the environment.
The final paper on this study states that butts coated with bitumen satisfied requirements for medium- and heavy-traffic mix designs. This would apply to interstates and surface streets with heavy commercial volume. Streets in residential neighborhoods, parking lots not marked for commercial vehicles and similar applications might use paraffin-coated butts. In the study, the research team used 10kg, 15kg and 25kg (about 22, 33 and 55lbs respectively) of encapsulated cigarette butts per cubic meter (1.30795cu.yd) to determine the ideal asphalt mix.

Since cigarette smoking on a global scale isn’t likely to go away anytime soon, finding new ways to deal with  this waste is becoming a more pressing problem every day. Estimates claim that the mass of discarded cigarette butts may increase by as much as 50% by 2025 because of the increase in global population. Knowing this, recycling these butts into asphalt and other lightweight construction materials, as the author of the study proposes, may help us all breathe just a little bit easier.

At Calvac Paving, we know we only have one planet, and it’s up to all of us to care for it the best way we know how. There’s no reason that building a solid product and being ecologically responsible should be mutually exclusive, and we’re always on the lookout for new ways to incorporate green ideas into our building design.. We will keep a close eye on this and other “green” developments in construction materials, so we can continue to deliver the most environmentally sound products and processes possible without compromising on quality or durability. It’s all part of our commitment to make the communities we serve, and the world we all share, a safer and healthier place for everyone.

© 2024 All Rights Reserved.


How Long Does Asphalt Take To Dry?

How Long Does Asphalt Take To Dry?

Facebook
LinkedIn
Twitter
Pinterest

One question we often hear at Calvac Paving is about asphalt cure times. This is a great question because understanding how the asphalt curing process works helps you understand when you can safely stripe, park, walk, and drive on the new asphalt parking lot and what sort of performance you can expect from your asphalt long-term. Let’s take a closer look at how the asphalt installation process works and how this affects the asphalt curing process!

 

 Asphalt Surface Installation

 

Most asphalt paving companies prefer not to place a fresh asphalt surface if the ambient temperature is outside the range of  50°F-90°F. If it’s too hot, asphalt will not cure quickly enough.  Paving when it’s too cold can cause the asphalt crack as it rapidly cools. Weather conditions can make a difference as well. If you watch carefully, you’ll notice paving companies rarely place asphalt in heavy rain. While it is possible to pave asphalt outside these parameters, it requires special preparation and oversight.

The rules for hot asphalt patch, resurfaced asphalt sealcoating and cold patch asphalt placement are a little different, so for purposes of this discussion, we’re going to focus on a clean installation on grade for commercial or residential paving like parking lots or a driveway.  

 

 How Long Does Asphalt Take to Cure?

The curing time for asphalt depends on the asphalt mix design, the oil content, the temperature of the mix, the thickness of the paved asphalt layers after compaction, and the temperature and weather conditions when the mix was placed. Generally, you can open new asphalt to public foot and vehicle traffic 48-72 hours after it is placed because this allows time for the asphalt to harden, but you may need to allow a bit more time during hot weather. Asphalt doesn’t fully cure for 6-12 months, so it’s important to keep a close eye on it during this time because it will be less resistant to damage.

The reason we stress the difference between “curing time” and “asphalt drying time,” even though they’re often used interchangeably is that asphalt is designed to be flexible. For it to remain flexible, it has to retain a certain amount of moisture. Water infiltration in paved asphalt driveways, parking lots, roadways, speed bumps, and other asphalt surfaces is the primary factor leading to a blacktop drying out. The water washes away the oil which keeps the asphalt overlay flexible and resilient. You can tell when asphalt dries because you’ll notice cracking, warping, raveling, and loose aggregate appearing on the surface of the matrix, especially sand and other fine aggregates. Fortunately, it takes months to years of asphalt drying time to start noticing signs other than cracking.

 

What Can I Do to Not Allow My Asphalt to Dry Out?

 

Good roadway and parking lot maintenance programs can help prevent a lot of problems. Putting down asphalt seal coating on a regular basis, especially when you freshen up your street or parking lot striping, can help prevent more costly asphalt repairs down the line. This is also a great time to do any basin repairs and crack filling, as catching these problems early, when they’re small, can keep your asphalt fresher and more flexible for a lot longer.

Asphalt sealer drying times vary, but 4-8 hours to dry is usually enough for your sealer to ensure it will keep water out. However, the full drying process for the sealer takes around 24 hours, and it’s important to allow your sealcoating to dry completely before line striping for maximum resiliency and effectiveness. As with any other kind of asphalt sealant, you want to allow crack sealer to cure for at least 24 hours in perfect conditions, and add a day for cool, cloudy, or high-humidity conditions just to be on the safe side.

 

 Final Thoughts About How Long It Takes Asphalt to Dry

 

Of course, the best mix design in the world won’t do you any good if it’s improperly placed, if your striping doesn’t meet the latest ADA criteria or if you don’t take proper care of it. For the best possible results and the greatest confidence in your paving job from breaking ground to the final walkthrough and for years of use beyond, click here to contact Calvac Paving. We’ve been proudly serving the Bay Area since 1972 on residential, commercial, and government projects of all types. Our track record for consistent quality, service, and excellence in every aspect of our operations speaks for itself. Put our experience to work for your paving refurbishment, repair, or new construction needs and see why Calvac Paving is the contractor you need for paving that works the first time, every time!

© 2024 All Rights Reserved.


Latest Bay Area Asphalt Repair Project From Calvac Paving

Latest Bay Area Asphalt Repair Project From Calvac Paving

Facebook
LinkedIn
Twitter
Pinterest

Modern technology and paving practices have revealed faster, more cost-effective solutions to problems that once would have required expensive tear-out and repaving operations. One of the best examples we at Calvac Paving have ever seen was the rehabilitation of the Redwood Shores parking lot we recently undertook. This project mixed new technology with time-tested techniques to deliver a great result for the client, faster and more efficiently than conventional paving methodology.

 

The parking lot itself was old, cracked and weathered from years of use, but not so bad as to need a complete removal and replacement. Age and oxidation from poorly placed asphalt atop moisture-sensitive base material had caused the asphalt to crack and dry out, reducing its flexibility and its resilience. The parking lot was in need of a major face-lift, and Calvac Paving had the perfect product and the years of specialized talents to make it happen. This was a very unique project in that it perfectly fit the criteria for a very specific application: a Petromat overlay.

Petromat is a non-woven reinforcing fabric that is applied using a liquid asphalt binder known as RS1, which works as a penetrating adhesive and moisture barrier. The Petromat fabric helps to retard the existing cracks from reflecting through the new asphalt surface and gives the finished surface a higher tensile strength, thereby distributes the weight of heavy truck traffic over a greater area. After that, a full two-inch placement of hot ½”fine asphalt is placed with self-propelled paving machines.  Once the asphalt has been placed, the compaction equipment follows immediately behind the paving equipment. These very large and heavy smooth drum rollers compact the hot asphalt to a dense, smooth and uniform finish.

Day 2 of the project

Once the compaction process is completed and the hot asphalt has cooled, we then apply a fog seal mixture of 50% SS1 and 50% water. This is designed to help bond the top layer of new asphalt and give it that black shiny “new pavement” look. After the Petromat overlay is 100% completed to our satisfaction, we can proceed with striping and stenciling operations.

Because of the unique considerations and time constraints of the job, Calvac Paving recommended a 2” Petromat overlay over the entire parking lot, measuring approximately 63,500 square feet. This offered the best results for the budget and gave them similar benefits to getting a brand-new parking lot for years to come, without the hassle, expense and lost time of a complete remove and replace. This project also had some very unique parking design restrictions, offering a perfect opportunity for Calvac Paving to design a new layout for the regular and ADA stalls. This redesign included larger stalls, which helped prevent unnecessary dents in car doors, making both the tenants, and owners happy with their new parking lot investment.

IMG_8848

Please feel free to drive by and see what a truly professional paving project should look like, and what your commercial parking lot can look like too! From a private roadway rebuild to a complete parking lot rehabilitation and much more, there are very few jobs Calvac Paving cannot do. We’ve been serving the Bay Area for more than 40 years. Now let us serve you! To find out more about Petromat or how we can help with your next project, contact us by email or by phone at:

(408) 225 – 7700

(650) 694 – 7944

(831) 375 – 7944

When you need the best, don’t leave the results to chance. Contact Calvac and have the job done right the first time, every time!

© 2024 All Rights Reserved.


Asphalt: The Most Recycled Material In America!

Asphalt: The Most Recycled Material In America!

Facebook
LinkedIn
Twitter
Pinterest
calvac paving asphalt and concrete project budgeting work

Recycling is important for our ongoing quality of life. It allows us to reclaim and reuse materials that would otherwise go to waste, clogging up landfills and contaminating our oceans. When most people think of recycling, they may think of cans, bottles, paper or even old computers. But surprisingly, the most recycled material in America is literally right under our feet: asphalt!

Unlike many recyclables, which may have limitations on specific types that can be recycled, any asphalt pavement can be 100% recycled. The American Asphalt Association recently released 2016 data which stated about 79 million tons of asphalt was reclaimed and reused in roadway mix designs and other activities, such as reprocessing into a recycled aggregate base course for use beneath the roadways themselves. In addition, nearly 1.8 million tons of waste and byproduct material from other industries were incorporated into asphaltic concrete mix designs in 2016.

We’ve previously discussed the possible use of plastic bottles and even cigarette butts as elements of asphalt designs which are being explored. By reclaiming these materials into asphalt, it increases their recyclability as part of the mix and helps reduce their impact in landfills. The APA says recycling asphalt saves an estimated 14,664 Olympic-sized swimming pools’ worth of landfill space each year. By adding other recyclable and waste materials to asphalt, this impact will only become greater in years to come.

Recycling asphalt isn’t just good for saving landfill space. It also reduces the environmental impact of quarrying and processing the aggregates and bituminous binders used in the asphalt production process.

Asphalt can be recycled in a number of ways. One of the most popular, and the way which reclaims 100% of the asphalt involved, is to pass chunks of asphalt through a special recycling assembly which raises the temperature to 300℉. Once the asphalt has been processed using this method, it can be laid down on roadways using existing paving technologies and techniques. In this form, it is known as Recycled Asphalt Pavement or RAP.

Another method of asphalt recycling involves crushing asphalt at a hot mix plant and using the resulting RAP as an additive for “virgin” hot mix. This type of recycling allows for over 30% of the final product to consist of recycled asphalt. By comparison, some brands of paper cups may use only 10-25% post-consumer content, highlighting the recyclable nature of asphalt.

A third way which also reclaims 100% asphalt is to crush the asphalt down into gradations suitable for road base. Rutgers University conducted a study in which RAP was compared to conventional aggregate subbase for use in roadways. The study showed the RAP had more elasticity and stiffness (are you sure they said this, seems contradictory) than the aggregate subbase when the two materials were laid using identical placement methodology. This means RAP is actually stronger, more resilient and better for the environment than regular aggregate road base while delivering comparable performance as a base material.

If the environmental benefits aren’t impressive enough, consider the potential savings for recycling. That’s right, recycling asphalt costs less than new paving! One estimate places potential savings at a national average of around 55%, or between 30-80%, over virgin hot mix.

It’s up to all of us to do our part to make our world a better, cleaner and healthier place, from the global level to our own homes. At Calvac Paving, we are always on the lookout for ways to perform our work more efficiently and cost-effectively while also remaining environmentally responsible. This means keeping a close watch on new technologies, methods and California State standards which would allow us to deliver comparable or superior results with less environmental impact and greater ROI for our clients. To learn more about Calvac Paving’s commitment to the environment, or to put the four decades of experience we’ve accrued to work for you, please contact us at (408) 225-7700 or www.calvacpaving.com

© 2024 All Rights Reserved.


The Greenest Mile: How Charging Roads May Make Electric Cars More Efficient Than Ever

The Greenest Mile:

How Charging Roads May Make Electric Cars More Efficient Than Ever

Facebook
LinkedIn
Twitter
Pinterest
electric car asphalt roads

At Calvac Paving, we support technologies and construction methodologies that offer a more environmentally sound and sustainable way of creating the things we as human beings have come to rely on. From asphaltic concrete recycling to innovations such as self-healing concrete, we are always on the lookout for trends and techniques that change how we operate for a greener, healthier planet. This is why we are so excited about the possibility of roads that actually recharge electric cars as they drive! These specially designed roadways will reduce pollution, increase the performance and range of electric cars to unheard-of levels, and reduce or entirely eliminate the need for charging stations.

 

In the UK, this seeming science fiction is becoming science fact, as the government moves to experiment with charging roads. Operating on the same principle as a wireless phone charger, the roads will charge cars through magnetic induction resonance. Cables implanted in the material of the roadway generate a specialized electromagnetic field that the car can convert into usable energy. The roads will also include communications equipment attuned to the unique energy signature of an electric car, alerting the road that an electric vehicle is present and to initiate the power generation process. This will allow properly equipped electric vehicles to recharge on the go, without needing to stop for extended periods to recharge, one of the biggest stumbling blocks cited in the adoption of electric vehicles thus far.

 

The roads the UK are experimenting with will be restricted for the time being, ensuring that regular vehicles do not impede the testing process. The government is committing 500 million pounds, or roughly $779 million, to these experimental roads over a five-year span. This technology is already in use in South Korea, powering rail systems with ranges of up to 15 miles, and will be combined with an added initiative to provide charging stations every 20 miles in the UK. The combination of options for drivers will help eliminate so-called “range anxiety,” which one advocate described as a combination of running low on gas and having one’s cell phone be low on battery simultaneously.

 

Recent Calvac Paving Project

Magnetic induction resonance works in much the same way as a powerful operatic voice can shatter crystal. When the voice and the crystal reach a similar resonance, the molecules in the crystal begin to vibrate rapidly and cause it finally to break. Instead of shattering or rupturing the battery, however, the cables the charging roads utilize will create a harmonic resonance within the battery that allows it to transform the signal from the roadway into usable power.

 

Because many roadways contain metal in addition to the native subgrade, road base and asphalt in the form of rebar, wire-mesh matting and metallic joints between road sections, the cables can use this metal as a part of the transmission system for the power. The metal components of the electric car can be employed as a receiver, directing the transmitted energy to the battery without the driver needing to stop, handle any charging devices or worry about whether or not the car will make it to the next charging station.

 

Major car production companies such as Audi are leading the research into this technology, which they believe will relegate internal-combustion vehicles to the status of horse and buggy. By working together to create a standardized plug-in system for use in garages, parking structures and ultimately at-home use, these car manufacturers believe they can make charging stations easier to find and thus make electric cars more attractive. The idea of “switching stations,” where a person can simply replace a drained battery with a fresh one and continue on, and the increased range of electric cars to around 250-300 miles per full charge depending on the type of car and battery size, will help expedite this process.

electric car asphalt paving roads

While paved roads are still very much a part of the future landscape, what drives over those roads and what lies beneath them may soon play a more crucial role than ever in our environmental integrity and ability to move people and cargo. Calvac Paving will be watching the trials in the UK with a great deal of interest because we want to see if this technology truly is feasible and what the implications will be for the paving industry. If everything pans out as the equations and scientists claim, this could be a major breakthrough and a huge tectonic shift in how things are designed in both construction and automotive industries, as well as manufacturing and transportation as a whole. We think that’s a pretty big win, and look forward to this technology here at home!

© 2024 All Rights Reserved.


Paving The Way Forward With Recycled Plastic

Paving The Way Forward With Recycled Plastic

Facebook
LinkedIn
Twitter
Pinterest
paving recycle plastic

From India to Indiana, from Cumbria, England to Corpus Christi, Texas, everyone agrees the amount of free-floating plastic in the environment is an ongoing problem. With an estimated 5 trillion pieces of plastic adrift on the surface of the ocean alone and uncountable more tons of the material in landfills and vacant lots all over the world, plastic both makes our current standard of living possible and poses one of its most dire threats.

At Calvac Paving, we make a point of keeping current on the latest breakthroughs and experiments in building and paving technologies, and new processes for repurposing plastic as a paving material is very much in our wheelhouse. Several different processes are in the testing stage, including using plastic to coat paving aggregates and reduce the amount of bitumen necessary for traditional asphalt; adding pellets of recycled plastic as part or all of the aggregate portion of the asphalt; and a Lego-like process of building roads from paving blocks of recycled plastic.

Apart from the obvious advantages of reducing the environmental impact of discarded free-range plastic, the primary benefit of utilizing plastic-impregnated asphalt is twofold. First, using plastic seems to increase the tensile strength of asphalt significantly, up to 60% in certain mixes.

Second, by reducing the amount of bitumen, or tar, used as the binding agent in most industrial asphalt mixes, it may also cut the cost of paving by up to 15%. The higher tensile strength potentially increases the size and mass of traffic that can use these roadways, meaning it may be possible to move more freight and larger vehicles in areas where existing paving and statutes would simply not permit them. In turn, this could substantially reduce transportation costs and thus the costs of everything from steel to gasoline to milk.

In addition, plastic-impregnated asphalt may lend itself more readily to hybridization with innovations such as the self-charging roads that we’ve discussed recently. As the costs of developing and deploying these technologies shrink, the likelihood of incorporating multiple technologies into a single roadway increases at a similar rate.

Almost as interesting as what plastic asphalt can do is the story of the various ways in which its applications came to be. In India, a chemistry professor, annoyed with the potholes of his city, remembered seeing people in Mumbai patching similar potholes by filling them with empty plastic bottles

and then heating them to a liquid state. In Scotland, an engineer built on the India protocol by using pellets of recycled plastic, aggregate and a very small amount of bituminous binder to create a roadway surface which causes less wear on tires. Meanwhile, a company in the Netherlands backing the block paving strategy was inspired by the idea that using interlocking blocks would allow for easier infrastructure placement and damaged section replacement.

By reducing the amount of “trash” plastic in the open environment and repurposing it in new ways, these innovators are also challenging accepted notions of what is possible in large-scale construction. These changes in turn may serve to make not only the final product of construction initiatives, but the processes and techniques by which they are created, more efficient, effective and environmentally friendly.

Calvac Paving takes our role in environmental sustainability and finding better ways to accomplish the tasks we undertake more effectively and safely very seriously. It is the entire reason we keep such a close eye on how construction technology is changing and evolving. When and where possible, we make it a point to adopt and implement these changes ourselves, because while we know the “tried and true” methods have survived and been used as long as they have for very good reasons, we also understand there’s almost always a better way to do just about anything if you’re willing to look hard enough for it.

logo_index_calvac

We at Calvac Paving believe we can best serve the communities we live and work in by emphasizing the fastest, safest and most c
ost-effective means available to do our jobs, while striving to reduce the impact our industry can have on the global as well as local environment. It’s all part of Calvac Paving’s commitment to not just doing the job, but doing it right. We do it for our clients/stakeholders, for our community and for a better, cleaner, healthier world. To learn more about Calvac’s commitment to the environment, or to put the four decades of experience we bring to every project to work for your job, please contact us at (408) 225-7700  or https://www.calvacpaving.com/contact-us/

© 2024 All Rights Reserved.